Home / Articles / How to determine the series of a house / Series GMS-1 (GMS-2001)
Standard series of houses GMS-1, GMS-2001
When designing new housing, leading construction companies strive to introduce effective technologies into their facilities that could provide the modern consumer with comfort combined with economical consumption of energy resources. A successful example in the field of housing construction is the series of multi-storey buildings GMS - 1. The project was developed in 2003 by order of the Glavmosstroy Insurance Company and has been successfully implemented within the Moscow Region and Moscow to this day.
GMS-1: features of construction and layout of apartments
GMS-1 is a new type of panel apartment buildings, which are built from isolated block sections. Buildings of different number of floors and heights are resistant to seismic activity of the earth. They are also protected from destruction that can be caused by partial damage to sections (collapses, domestic explosions). GMS-1 facilities are characterized by excellent thermal protection and sound insulation. At the same time, like other panel-type houses, they are quickly erected. The cost of apartments is low compared to business and elite class.
Together with the new construction method, the general designs of residential buildings of the GMS-1 series include the highest requirements for modern housing by consumers. This:
- spacious rooms with increased area and thoughtful layout;
- paired windows in the rooms providing bright lighting during the day;
- ceilings 3 m high;
- separate sanitary rooms (not adjacent to the partitions of neighboring apartments);
- 2 bathrooms in 2 and 3-room apartments;
- spacious halls;
- freight and passenger elevators in each entrance;
- ramps for people with disabilities;
- auxiliary and utility rooms located on the ground floor: concierge room, stroller room, electrical switchboards, storage sheds for cleaning equipment, etc.;
- fire protection system with smoke-free stairs and balconies;
- mobile waste chutes on sites;
- natural exhaust ventilation system.
Over the past period, more than 70 houses have been put into operation. Visually they are recognizable by double windows and glazed loggias. However, the façade of the buildings is designed at the request of the customer - faced with brick, panels or cellular concrete blocks. Houses are painted in different colors, among which pastel shades of pink, beige, turquoise and others predominate. This approach allows you to hide the “serial nature” of objects and make them individual in appearance.
In the capital, residential complexes of the GMS-1 series are rising in both new and old microdistricts (Maryinsky Park, South Butovo, Kuntsevo, Perovo, Koptevo, etc.). Within the region, improved type panel houses have been built or are under construction in the cities of Lyubertsy, Krasnogorsk, Podolsk.
Residential buildings of the GMS-1 series are designed in two versions: commercial and municipal. The main difference between them is the square footage of the apartments - in commercial buildings the living area is larger.
Residential multi-apartment buildings of the GMS-1 series are being built within the range of 9-18 floors. The first floor is allocated for utility and auxiliary premises. The number of entrances in houses is not limited and can be from 1 or more. Each entrance is equipped with passenger and freight elevators with a lifting capacity of 400 and 630 kg, respectively. There are 3-4 apartments on each floor. Most of them have storage rooms, as well as small closed rooms that are used as dressing rooms. The area of residential and non-residential rooms depends on the layout and type of housing. The total square footage of the apartments ranges from 26-84 m2. General average quadrature data is shown in the table below.
The main foundations on which our company is based
- Quality comes first. We always strive to achieve maximum results. Regardless of what class of repairs are being carried out, we always follow technology so that the work we do will please you for many years.
- All the best goes to the client. That's why we provide step-by-step pricing, allowing you to track your costs.
- Do not interfere or bother. Our specialists always work autonomously, you do not depend on them, and they do not depend on you. That is why during the renovation period you can go on vacation or just go about your business without being distracted by workers.
- Honesty and integrity. Before starting construction work, we always determine realistic deadlines and clear costs. In the future, we stick to our promises, do not delay the repair process, and there is no question of incurring additional costs.
Make your choice in favor of LionGroup. We assure you, you won't regret it.
Areas of apartments in houses of the GMS-1 series
Number of rooms in the apartment | Total area, m2 | Living area, m2 | Kitchen, m2 |
1 | 26-29 | 17-19 | 9-10 |
2 | 38-54 | 29-43 | 9-11 |
3 | 49-73 | 40-61 | 9-12 |
4 | 75-84 | 64-72 | 11-12 |
Apartments in the houses of the GMS-1 series are equipped with glazed loggias. The street walls of residential buildings are multi-layered; they consist of 2 reinforced concrete slabs, between which insulation is placed. The total thickness of the external walls is 34 cm. Reinforced concrete slabs 18 cm thick are used as inter-apartment partitions. Interior walls are made of 14 cm gypsum concrete, floors are made of reinforced concrete 16 cm thick. Most of the walls between rooms and apartments are load-bearing. Accordingly, redevelopment of housing is possible only if certain permits are obtained.
Disadvantages of apartment buildings of the GMS-1 series
Despite the presence of a large number of advantages, the houses of the GMS-1 series are not without some shortcomings. Among the main disadvantages faced by apartment owners, it is worth noting:
- restrictions when carrying out redevelopment - due to the fact that most interior walls are load-bearing;
- narrow corridors.
Despite these shortcomings, apartments from Glavmosstroy are in demand. They are affordable, safe and comfortable to live in.
To repair joints between slabs, partial opening of the seam and application of a fresh layer of sealing compound can be used.
We carry out high quality and professional sealing in a variety of ways and offer you:
* insulation of lintels/lintels after repairs of loggias/balconies;
* arrangement of joints in old-type buildings, with opening of plastered joints;
* complete opening of joints, replacement and application of new insulation;
* incomplete opening of joints, partial replacement and sealing of seams.
Zheleznodorozhny, Rozhdestvenskaya street 2,4,6,8,10
st. Bazovskaya 15 building 1,2,4,6,8,9,10,11.12;13;14;15,16
WHAT TECHNOLOGY DO WE OFFER?
To ensure that the insulation of interpanel joints is carried out at the highest level, we use advanced “warm seam” technology. During the work, we place tubular insulation in the seams, choosing the required diameter of this building material. The type of insulation is reminiscent of hose-like tubes. It is made using polyethylene foam and has many tiny closed pores inside. Polyethylene foam products are practically incapable of absorbing water and perfectly insulate heat. Preference is given to Vilaterm. However, Isonel, Plenex and Energoflex also have their own positive characteristics.
As a rule, problems with depressurized joints appear on the lower and upper floors of the building. The first and zero levels suffer from moisture created by precipitation. The liquid runs through the joints, using the hygroscopicity of finishing and building materials. The upper floor is not resistant due to the technical level, where liquid accumulates in the cavities of the seams.
Examples of prices for work
No. | Name of works | Unit Change | Cost per unit |
Floors | |||
40 | Installation of vinyl tiles | m/2 | 750,00 ₽ |
41 | Floor plug installation | m/2 | 420,00 ₽ |
42 | Installation of plastic plinths | m/n | 150,00 ₽ |
43 | Installation of PVC skirting boards | m/n | 180,00 ₽ |
44 | Washed down PVC skirting boards | PC. | 100,00 ₽ |
Walls | |||
82 | Laying clinker bricks | m/2 | 1 400,00 ₽ |
83 | Laying artificial stone | m/2 | 1 400,00 ₽ |
84 | Laying natural stone | m/2 | 1 550,00 ₽ |
85 | Cladding walls with clapboard | m/2 | 590,00 ₽ |
73 | Textured plaster installation | m/2 | 650,00 ₽ |
Ceiling | |||
100 | Painting ceiling molding (gypsum) | m/n | 290,00 ₽ |
100 | Installation of tiles for the ceiling (caramogranite, ceramic, 10*10 to 60*60) | m/2 | 1 450,00 ₽ |
101 | Mosaic installation on the ceiling | m/2 | 1 600,00 ₽ |
101 | Grouting tile joints on the ceiling | m/2 | 200,00 ₽ |
102 | Fabric stretch ceiling device | m/2 | 850,00 ₽ |
Electric installation work | |||
136 | Installing and connecting a telephone socket | PC. | 174,00 ₽ |
137 | Installation and connection of fans | PC. | 1 250,00 ₽ |
138 | Installation and connection of the heated floor controller | PC. | 1 160,00 ₽ |
139 | Installation and connection of a lamp in the ceiling (gypsum plasterboard or stretch ceiling) | dot | 480,00 ₽ |
142 | Connecting the electrical panel to the central power supply | PC. | 1 420,00 ₽ |
Plumbing | |||
184 | Installation and connection of a food chopper | PC. | 1 900,00 ₽ |
185 | Installation and connection of the sink | PC. | 1 650,00 ₽ |
186 | Installation and connection of a floor-standing toilet | PC. | 2 800,00 ₽ |
187 | Installation and connection of a wall-hung toilet | PC. | 5 500,00 ₽ |
188 | Installation and connection of a hygienic shower | PC. | 1 800,00 ₽ |
Dismantling works | |||
198 | Removing old insulation (mineral wool) | m/2 | 150,00 ₽ |
199 | Dismantling of monolithic partitions | m/2 | 1 460,00 ₽ |
202 | Dismantling the laminate | m/2 | 130,00 ₽ |
203 | Dismantling the Parquet Board | m/2 | 155,00 ₽ |
204 | Dismantling solid wood | m/2 | 245,00 ₽ |
Ancillary work | |||
213 | Removal of construction waste | gazelle | 2 500,00 ₽ |
214 | Construction waste removal | container | 4 800,00 ₽ |
216 | Lifting building material | kg. | 2,00 ₽ |
219 | Cleaning the apartment after renovation | m/2 | 80,00 ₽ |
220 | Delivery of rough material (Gazelle 1500 kg) | PC. | 1 250,00 ₽ |
Slopes | |||
223 | Installation of slopes from gypsum plasterboard | m/n | 450,00 ₽ |
224 | Primer of slopes before putty | m/n | 50,00 ₽ |
228 | Painting slopes | m/n | 220,00 ₽ |
229 | Laying tiles on slopes | m/n | 650,00 ₽ |
230 | Installation of PVC slopes | m/n | 460,00 ₽ |
Installation work | |||
245 | Installation of a room door | PC. | 2 500,00 ₽ |
246 | Installation of extensions to an interior door (set) | PC. | 800,00 ₽ |
248 | Installation of accessories (hooks, holder, stand, door lock) | PC. | 450,00 ₽ |
249 | Installation of a cabinet in a bathroom. Knot | PC. | 1 350,00 ₽ |
250 | Assembly and installation of the bathroom cabinet. Knot | PC. | 2 160,00 ₽ |
Full price list for services
COST OF JOINT SEALING SERVICES
In order to find out the exact cost of joint sealing services, you need to contact our specialists. However, we can tell you approximate amounts right now:
* 30 linear meters - 1 room apartment;
* 30..39..46 linear meters - two-room apartment; depending on its location in the house (end or non-end, corner)
* 3-room apartment in this series - from 44 (not end) to 74 linear. (end)
As a rule, the square meters of one-room housing are less than 30 linear meters. meters, regardless of whether we are talking about an end or non-end apartment. The cost of work for the STANDARD option is 10,500 rubles, for Warm seam - 3,000 rubles more. It also matters whether it is necessary to open the seam completely or partially.
13,500 rubles is the minimum order amount for insulation of interpanel joints. The price already includes all possible expenses - materials, services themselves, payment for access to the roof.
Coordination of services with representatives of regulatory organizations, for example, with DEZ, is undertaken by the specialists of our company.
How to order repairs to the interpanel seams of your apartment?
The application is made 1-2 working days before the start of work.
This time will be needed to obtain permission to work from Des or the management company. The work itself on external sealing of panel joints is carried out during the day from 9-00 to 19-00. To make an application: - Call ☎, and the manager will accept your application and answer your questions. For the convenience of customers, a calculator has appeared on the company’s website to calculate seam insulation services. In order to calculate the cost of sealing, you need to select the number of storeys of the house and the type of insulation. Then click on the CALCULATION button, after which the card for filling out the client’s data will open:
⇆ Calculation
What you need to know about sealing seams: / Who should insulate interpanel seams and at whose expense? / How to force the management company to seal interpanel seams? / Reasons for the appearance of mold on the walls of an apartment / The walls in a panel house freeze, what should I do? / Typical mistakes in sealing seams between panels / Instructions, building codes, VSN, regulations for sealing seams
Examples of completed work
We are ready to provide you with a design project, where you can familiarize yourself with all the details and features that your apartment will have after the completion of the renovation work. Play of light, heated floors, multi-tiered ceilings - LionGroup specialists will do all this and much more without any problems.