Description
A distinctive feature of this series is the combination of an internal wall structural scheme made of reinforced concrete panels and external brick walls with floor-to-floor support, which is quite non-standard for panel houses. The construction of external walls made of bricks with insulation, rather than curtain panels, avoids depressurization of joints and increases the thermal insulation properties of enclosing structures. Despite the significant labor costs for the construction of external walls compared to purely panel buildings, a house of this series, due to the rapid installation of internal reinforced concrete panels, can be built in just a year, which makes such a constructive solution not only high-quality, but also not expensive. Residential buildings of the I-1723 series belong to the so-called wide-frame houses (WBCs).[1], that is, the step between load-bearing walls compared to conventional panel houses is increased to 3-4.2 meters. Due to this solution, the building produces relatively large areas of rooms and apartments, more adapted to modern conditions of comfortable living than conventional panel series. Since the internal frame of the building is made of prefabricated reinforced concrete panels, almost all the walls inside the apartments are load-bearing, which significantly limits apartment owners in the ability to change the layout of the apartment to suit their needs.
First option. Rearranging furniture
The initial layout is convenient, so there is no urgent need to move walls or create new openings - you can create a comfortable space by arranging furniture. We organized a living room in a large room with a bay window, and a bedroom in a smaller one.
The spacious hallway made it possible to install a large built-in wardrobe that can accommodate not only outerwear. To the left of the front door you can place a shoe shelf, and to the right - a console or bookcase.
A washbasin has been added to the powder room, and a washing machine can easily be placed under the bathroom sink.
Main characteristics
Planning solution | Panel houses with external walls made of bricks supported floor by floor |
Number of sections (entrances) | 1 or more |
Number of storeys | 14-17 floors |
Height of living quarters | 2.70 m |
Elevators | 2 elevators, passenger and cargo-passenger |
Balconies | Loggias in all apartments, bay windows in 2- and 3-room apartments |
Number of apartments per floor | 4, 5, 6 |
Bathrooms | In one-room apartments there is a combined one, in two-room apartments there is a separate one, in three-room apartments there are two bathrooms - a combined one and an additional toilet with a washbasin. |
Estimate
Type of design | Material | Quantity | Cost, rub. |
FLOORS | |||
Entire facility | Silk Road porcelain tiles (RHS) | 33.4m2 | 67 300 |
Strained glass; stone (Russia) | 8m2 | 24 000 | |
Quick-Step laminate | 41.2m2 | 56 500 | |
WALLS | |||
Bathroom, toilet | SilkRoad porcelain tiles (RHS) | 49.7m2 | 119 500 |
Rest | Plaster Riviera and Intuel (Clavel) | 55kg | 18 300 |
High-pressure paint, Tikkurila color | 36l | 13 400 | |
CEILINGS | |||
Entire facility | High-pressure paint, Tikkurila color | 27l | 9700 |
DOORS (complete with fittings) | |||
Hallway | Steel Guardian | 1 PC. | 36 400 |
Entire facility | Swing Wippro; sliding Doka | 4 things. | 111 000 |
PLUMBING | |||
Bathroom, toilet | Acrylic bathtub, curtains - Ravak | — | 42 300 |
Console toilet, sink - Laufen Pro; Grohe installation | 3 pcs. | 45 200 | |
Bathrooms, kitchen | Heated towel rail, faucets, shower stand - Hansgrohe | 5 pieces. | 48 200 |
ELECTRICAL INSTALLATION EQUIPMENT | |||
Entire facility | Sockets, switches - Legrand | 54 pcs. | 25 000 |
LIGHTING | |||
Entire facility | Lamps (Italy, Germany) | — | 181 800 |
FURNITURE AND INTERIOR DETAILS (including custom-made) | |||
Hallway | Shelf, mirror - Riflessi; Mussi pouf | — | 36 800 |
Kitchen | Kitchen Giulia Novars (without appliances) | 4 linear m | 312 400 |
Table, chairs - Miniforms | 7 pcs. | 89 200 | |
Living room | Sofa, pouf, coffee table - Doimo; cabinets, racks, shelves - hlsta | — | 363 400 |
Parents' bedroom | Bed, nightstands, chest of drawers - hlsta; armchair Tonin | — | 154 800 |
Children's | Children's furniture; sports complex | — | 189 400 |
Balcony | Tabletop, rack, cabinet - Ikea | — | 25 800 |
Entire facility | Sliding wardrobe, accessories for dressing rooms - SimplexGroup | — | 90 700 |
Bathroom | Bathroom furniture Eurolegno | — | 44 800 |
TOTAL (excluding the cost of work and finishing materials) | 2 105 900 |
Login or register to see the full estimate
Source
Building construction
Stairs | Prefabricated reinforced concrete with access to a common loggia |
Garbage chute | With loading valve on each floor |
Exterior walls | Three-layer, made of ceramic bricks on cement-sand mortar with a layer of effective insulation (PSB), the total thickness of the walls is 520 mm thick. |
Internal walls | Prefabricated reinforced concrete panels 18 cm thick. |
Interior partitions | Brick 120 mm thick. or from gypsum concrete slabs 80 mm thick. |
Loggias and balconies | Loggias in all apartments (in most cases glazed by the developer), bay windows in 2- and 3-room apartments |
Roof type | Flat roll |
Examples of completed work
On our website you can see examples of our work - we assure you that we have something to show you. This is only a small part of what makes our company remarkable; you will experience all the benefits of cooperation with LionGroup when you contact us for help.
Literature
- T. G. Maklakova, S. M. Nanasova.
Constructions of civil buildings. - ed. 2nd, revised and additional - M.: ABC, 2000. - 280 p. — ISBN 5-93093-040-6. - Shereshevsky I.A.
Constructions of civil buildings. — Architecture-S. - M., 2005. - 160 p. — ISBN 5964700373.
Non-residential buildings | Shopping center (glass) • Supermarket • Kindergarten • School • Cinema • Hotel |
Related concepts | Blocked development (Lanehouse) • House-building plant • Townhouse |
What can we offer you?
We offer repair work of various classes, levels of complexity and price categories, so everyone will find the most suitable offer for themselves:
- If you want to refresh the interior of your apartment, paint it in different colors, or just change it a little, we can carry out cosmetic repairs.
- In order to create a more modern atmosphere in the interior of the apartment, without resorting to large expenses, we recommend paying attention to the major renovation of apartments that is offered.
- Strive to create a unique, modern interior, want to transform your apartment, make it as stylish and practical as possible - then we can offer you European-quality renovation.
- If you are used to always getting the best, you are a supporter of change and want to transform your apartment beyond recognition, use natural materials or create an interior from the cover of glossy magazines - an elite renovation will satisfy all your needs.
We are ready to implement all this especially for you. "LionGroup" is your assistant in repairs.
Excerpt characterizing I-1723
X The French troops gradually melted away in a mathematically correct progression. And that crossing of the Berezina, about which so much has been written, was only one of the intermediate stages in the destruction of the French army, and not at all a decisive episode of the campaign. If so much has been and is being written about the Berezina, then on the part of the French this happened only because on the broken Berezina Bridge, the disasters that the French army had previously suffered evenly here suddenly grouped together at one moment and into one tragic spectacle that remained in everyone’s memory. On the Russian side, they talked and wrote so much about the Berezina only because, far from the theater of war, in St. Petersburg, a plan was drawn up (by Pfuel) to capture Napoleon in a strategic trap on the Berezina River. Everyone was convinced that everything would actually happen exactly as planned, and therefore insisted that it was the Berezina crossing that destroyed the French. In essence, the results of the Berezinsky crossing were much less disastrous for the French in terms of the loss of guns and prisoners than Krasnoye, as the numbers show. The only significance of the Berezina crossing is that this crossing obviously and undoubtedly proved the falsity of all plans for cutting off and the justice of the only possible course of action demanded by both Kutuzov and all the troops (mass) - only following the enemy. The crowd of Frenchmen fled with an ever-increasing force of speed, with all their energy directed towards achieving their goal. She ran like a wounded animal, and she could not get in the way. This was proven not so much by the construction of the crossing as by the traffic on the bridges. When the bridges were broken, unarmed soldiers, Moscow residents, women and children who were in the French convoy - all, under the influence of the force of inertia, did not give up, but ran forward into the boats, into the frozen water. This aspiration was reasonable. The situation of both those fleeing and those pursuing was equally bad. Remaining with his own, each in distress hoped for the help of a comrade, for a certain place he occupied among his own. Having given himself over to the Russians, he was in the same position of distress, but he was on a lower level in terms of satisfying the needs of life. The French did not need to have correct information that half of the prisoners, with whom they did not know what to do, despite all the Russians’ desire to save them, died from cold and hunger; they felt that it could not be otherwise. The most compassionate Russian commanders and hunters of the French, the French in Russian service could not do anything for the prisoners. The French were destroyed by the disaster in which the Russian army was located. It was impossible to take away bread and clothing from hungry, necessary soldiers in order to give it to the French who were not harmful, not hated, not guilty, but simply unnecessary. Some did; but this was only an exception. Behind was certain death; there was hope ahead. The ships were burned; there was no other salvation but a collective flight, and all the forces of the French were directed towards this collective flight. The further the French fled, the more pitiful their remnants were, especially after the Berezina, on which, as a result of the St. Petersburg plan, special hopes were pinned, the more the passions of the Russian commanders flared up, blaming each other and especially Kutuzov. Believing that the failure of the Berezinsky Petersburg plan would be attributed to him, dissatisfaction with him, contempt for him and ridicule of him were expressed more and more strongly. Teasing and contempt, of course, were expressed in a respectful form, in a form in which Kutuzov could not even ask what and for what he was accused. They didn't talk to him seriously; reporting to him and asking his permission, they pretended to perform a sad ritual, and behind his back they winked and tried to deceive him at every step.
Letters from readers
Letters from readers
The magazine's editors answer readers' questions about what materials can be used for paving garden paths, and where to buy a Czech set in a retro style.
The magazine presents articles on repairs and interior design. The magazine offers a set of planning and design solutions, reviews of repair and construction materials, furniture, appliances and equipment.
Main sections: Redevelopment, Materials, Structures, Engineering systems, Equipment and tools, DIY, Furniture, Decor and accessories, House and landscape, Problems, Market news.
Examples of prices for work
No. | Name of works | Unit Change | Cost per unit |
Floors | |||
21 | Grouting mosaic joints | m/2 | 230,00 ₽ |
22 | Self-leveling floor device | m/2 | 350,00 ₽ |
26 | Plywood polishing | m/2 | 180,00 ₽ |
27 | Installation of underlay for laminate flooring and parquet boards | m/2 | 75,00 ₽ |
28 | Laying laminate (horizontal, vertical) | m/2 | 350,00 ₽ |
Walls | |||
59 | Gluing fiberglass | m/2 | 220,00 ₽ |
60 | Finishing putty before painting | m/2 | 250,00 ₽ |
63 | Laying tiles on walls (caramogranite, ceramic, 10*10 to 60*60) | m/2 | 1 000,00 ₽ |
64 | Laying floor tiles (caramogranite, ceramic, 10*10 to 60*60) at 45° | m/2 | 1 200,00 ₽ |
65 | Laying seamless tiles | m/2 | 1 450,00 ₽ |
Ceiling | |||
89 | Joining seams in gypsum plasterboard ceilings | m/2 | 120,00 ₽ |
89 | Filling the seams of the ceiling from gypsum board UNIFLOT and gluing with serpyanka | m/2 | 80,00 ₽ |
91 | Installation of ceiling molding made of foam plastic | m/n | 150,00 ₽ |
91 | Installation of ceiling molding made of polyurethane | m/n | 290,00 ₽ |
92 | Installation of plaster ceiling molding | m/n | 490,00 ₽ |
Electric installation work | |||
111 | Connecting machines | PC. | 315,00 ₽ |
112 | Connecting a differential machine | PC. | 410,00 ₽ |
115 | Installation of a socket box with installation of a socket box in concrete | dot | 630,00 ₽ |
116 | Installation of a socket box with installation of a socket box in a tongue-and-groove block | dot | 480,00 ₽ |
117 | Installation of grooves for cables in concrete | m/n | 296,00 ₽ |
Plumbing | |||
151 | P/P wiring | dot | 4 000,00 ₽ |
154 | Construction of a niche for the collector panel (concrete) | PC. | 3 800,00 ₽ |
155 | Construction of a niche for the collector panel (tongue-and-groove, foam block, cinder block, gypsum board) | PC. | 2 500,00 ₽ |
156 | Manifold cabinet design | PC. | 1 900,00 ₽ |
157 | Installation and connection of the heating collector | PC. | 4 000,00 ₽ |
Dismantling works | |||
195 | Dismantling plasterboard partitions | m/2 | 160,00 ₽ |
196 | Dismantling of gypsum plasterboard partitions | m/2 | 160,00 ₽ |
198 | Removing old insulation (mineral wool) | m/2 | 150,00 ₽ |
199 | Dismantling of monolithic partitions | m/2 | 1 460,00 ₽ |
200 | Dismantling the balcony block | PC. | 4 600,00 ₽ |
Ancillary work | |||
213 | Removal of construction waste | gazelle | 2 500,00 ₽ |
214 | Construction waste removal | container | 4 800,00 ₽ |
216 | Lifting building material | kg. | 2,00 ₽ |
219 | Cleaning the apartment after renovation | m/2 | 80,00 ₽ |
220 | Delivery of rough material (Gazelle 1500 kg) | PC. | 1 250,00 ₽ |
Slopes | |||
227 | Finishing putty | m/n | 250,00 ₽ |
228 | Painting slopes | m/n | 220,00 ₽ |
230 | Installation of PVC slopes | m/n | 460,00 ₽ |
231 | PVC window sill installation | m/n | 480,00 ₽ |
232 | Installation of a wooden window sill | m/n | 650,00 ₽ |
Installation work | |||
242 | Installation of an apron from a block under the bathroom with installation of an invisible flap | PC. | 3 600,00 ₽ |
243 | Covering the area of GKL walls | m/2 | 560,00 ₽ |
246 | Installation of extensions to an interior door (set) | PC. | 800,00 ₽ |
247 | Installation and insertion of a lock into an interior door | PC. | 550,00 ₽ |
248 | Installation of accessories (hooks, holder, stand, door lock) | PC. | 450,00 ₽ |
Full price list for services